50 kW• Fast24/7Active in MITECO registry

MU-Totana-003

El Granado (Pg. Industrial El Saladar),1, Murcia (30850), Murcia, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (3 plugs)
GPS Coordinates37.77519, -1.45374
Official ID2024000430
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Murcia, belonging to the province of Murcia (Murcia, Región de, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:63 A
2Charging Bay #2
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000430
Post / EVSE Identifier #1COD20240000018555PR00001270
Post / EVSE Identifier #2ES*IBD*E5406
Post / EVSE Identifier #35614
Post / EVSE Identifier #4COD20240000018556PR00001271
Post / EVSE Identifier #5ES*IBD*E5407
Post / EVSE Identifier #65616
Post / EVSE Identifier #75615

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
📅Advance slot reservation supported
📱Mobile App (Remote activation & eMSP roaming)
✓PAGO CON TARJETA DE DÉBITO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.775191 | Lon: -1.453744View on OpenStreetMap →

Other Nearby Charging Stations

250 kW(Ultra-fast)
110 m away

Totana, Spain

2 C. El Olivo, Totana, Mc 30850, Es, 2
Operator:Tesla Spain SLU
CCS Combo 2
8 points • 8 plugs
Details
10.53 kW(Semi-fast)⛽Estación Repsol
3.1 km away

61806002140015

Repsol - Autovia A-7, Km 606 (Dirección
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
21.06 kW(Semi-fast)⛽Estación Repsol
3.2 km away

61806002140012

Repsol - Autovía A7 Km 606 (Dirección
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.