50 kW• Fast24/7Active in MITECO registry

MU-MolinadeSegura-005

Madrid,129, Abarán (30500), Murcia, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (4 plugs)
GPS Coordinates38.05938, -1.21740
Official ID2024000857
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Abarán, belonging to the province of Murcia (Murcia, Región de, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:150 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:150 A
2Charging Bay #2
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:150 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:150 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000857
Post / EVSE Identifier #1COD20240000019496PR00002532
Post / EVSE Identifier #2ES*IBD*E220526
Post / EVSE Identifier #3232438
Post / EVSE Identifier #4232437
Post / EVSE Identifier #5COD20240000019495PR00002531
Post / EVSE Identifier #6ES*IBD*E220515
Post / EVSE Identifier #7232428
Post / EVSE Identifier #8232427

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE DÉBITO
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access. Additional amenities: RESTAURANTE

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.05938 | Lon: -1.2174View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
5.2 km away

MU-Murcia-050

N-301,32
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.