22.17 kW• Semi-fast🛒Supermercado Mercadona24/7Active in MITECO registry

Mercadona, Virgen de las montañas, Cadiz

C/ Virgen De Las Montañas, S/N - C/ Cno. De Grazalema, Villamartín (11650), Cádiz, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates36.85385, -5.63330
Official IDSMMMZZ7NBLYG0ZLIRB5J
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Villamartín, belonging to the province of Cádiz (Andalucía, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeSMMMZZ7NBLYG0ZLIRB5J
Post / EVSE Identifier #1EDQYQIDLYXUQNDZ6GMUZFFRGX8R
Post / EVSE Identifier #2ES*REP*E14823*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4RCEDMYVKMXA8AU5RB7MHMQWGHKL
Post / EVSE Identifier #5ES*REP*E14823*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7OSSIPNGQIZM8MKDNI1ZN2FZAZDP
Post / EVSE Identifier #8ES*REP*E14824*1
Post / EVSE Identifier #9KSVFSZ0HIMBTVUNHTQBOXWH1BMA
Post / EVSE Identifier #10ES*REP*E14824*2

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 36.853849 | Lon: -5.633296View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
1.8 km away

CA-Villamartin-002

Avenida De Arcos,76
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
4 points • 4 plugs
Details
22 kW(Semi-fast)
10.6 km away

Ayto. Bornos

Calle Miguel De Cervantes, 9-1
Operator:Wenea Services Spain, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.