22.17 kW• Semi-fast🛒Supermercado Mercadona24/7Active in MITECO registry

Mercadona, Urb. La Grama, Las Palmas

Urb. La Grama, Sector 2, Parcela Ia-9.2, Breña Alta (38713), Santa Cruz de Tenerife, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity6 bays (6 plugs)
GPS Coordinates28.66809, -17.77203
Official IDBYOSNLJPM7BT04UUQKM0
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Breña Alta, belonging to the province of Santa Cruz de Tenerife (Canarias, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeBYOSNLJPM7BT04UUQKM0
Post / EVSE Identifier #1ODD6BP86WQLLAG1N9VUS6AK3LNS
Post / EVSE Identifier #2ES*REP*E17152*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4MWFKI7AOVFPVEYWTQC7MOWUFRXR
Post / EVSE Identifier #5ES*REP*E17152*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7LH3GVRUR5K1VXTWL1SB90SIU5ZW
Post / EVSE Identifier #8ES*REP*E17153*1
Post / EVSE Identifier #9LPPEQBSJZW1SKEF4H41YN0XHMUH
Post / EVSE Identifier #10ES*REP*E17153*2
Post / EVSE Identifier #11X6EWTXALK9UI6LASG7FSCFKJUGA
Post / EVSE Identifier #12ES*REP*E17154*1
Post / EVSE Identifier #13WNZXF67RL4FMZ3O8LAOBZ0ROYSD
Post / EVSE Identifier #14ES*REP*E17154*2

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.668085 | Lon: -17.772027View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)⛽Estación Shell
9.5 km away

SHELL EL PASO

Carretera General Padrón, Km 24,300, 38758, Santa Cruz de Tenerife
Operator:Prio Recharge Sl.
CCS Combo 2
2 points • 2 plugs
Details
22 kW(Semi-fast)
13.7 km away

62234031810004

Av. Venezuela, 10, 38768 Los Llanos, Santa
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.