22.17 kW• Semi-fast🛒Supermercado Mercadona24/7Active in MITECO registry

Mercadona, Floridablanca, Murcia

C/ Floridablanca, 66, Cartagena (30310), Murcia, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates37.63720, -1.00038
Official ID2GQFLZOLQ9MB5IQPPPXA
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cartagena, belonging to the province of Murcia (Murcia, Región de, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2GQFLZOLQ9MB5IQPPPXA
Post / EVSE Identifier #1YPLR0MO1JW8GJKQZU4CUXOWCWYK
Post / EVSE Identifier #2ES*REP*E17323*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4P2SLHPPFEZMFEKTCTN28WYTHGQI
Post / EVSE Identifier #5ES*REP*E17323*2
Post / EVSE Identifier #62
Post / EVSE Identifier #72XLMDROD33XDUUQUUWOYHM4YQMK
Post / EVSE Identifier #8ES*REP*E17324*1
Post / EVSE Identifier #9X5OXWXFB17QFEQEDOZMNYSVYRV9
Post / EVSE Identifier #10ES*REP*E17324*2

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.637202 | Lon: -1.00038View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
2.1 km away

MU-Cartagena-022

Padua (Pg. Santa Ana),3
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
3.3 km away

MU-Cartagena-033

Ferrol,9
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
7.4 kW(Semi-fast)🅿️Parking
4.0 km away

Parking del Par

Calle Real 34
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.