22.17 kW• Semi-fast🛒Supermercado Mercadona24/7Active in MITECO registry

Mercadona, Cno. Vell de Ciutat, Baleares

Cno. Vell De Ciutat, 41 - 43, Alaior (07630), Balears, Illes, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity6 bays (6 plugs)
GPS Coordinates39.43760, 3.00167
Official IDVF9EF9W3OR78SLE4NHRV
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Alaior, belonging to the province of Balears, Illes (Balears, Illes, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeVF9EF9W3OR78SLE4NHRV
Post / EVSE Identifier #19ZTSTZYZ71P2YVAOWKCJ8TACHJR
Post / EVSE Identifier #2ES*REP*E15496*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4AIYJWPJECJ3C0ADORF2LEZI2U7J
Post / EVSE Identifier #5ES*REP*E15496*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7TVGM8RBGXK57ZMPY3PSJAAPR31I
Post / EVSE Identifier #8ES*REP*E15497*1
Post / EVSE Identifier #9ASQKN8YKSRJ8PMJQDKACTF9ATHA
Post / EVSE Identifier #10ES*REP*E15497*2
Post / EVSE Identifier #113XRNGRFHRSNACUSDLB087LRZLGL
Post / EVSE Identifier #12ES*REP*E15498*1
Post / EVSE Identifier #13OYY6HP5UJLUDVDXVFL6A8DUAQ3Y
Post / EVSE Identifier #14ES*REP*E15498*2

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.437596 | Lon: 3.001666View on OpenStreetMap →

Other Nearby Charging Stations

11 kW(Semi-fast)
11.8 km away

CAS CONCOS

PLAÇA ESGLESIA, 18
Operator:AYUNTAMIENTO DE FELANITX
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
11 kW(Semi-fast)
12.0 km away

GUILLEM TIMONER 2

POLIESPORTIU GUILLEM TIMONER, Ctra. Felanitx-Campos
Operator:AYUNTAMIENTO DE FELANITX
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
11 kW(Semi-fast)
12.0 km away

GUILLEM TIMONER 1

POLIESPORTIU GUILLEM TIMONER, Ctra. Felanitx-Campos
Operator:AYUNTAMIENTO DE FELANITX
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.