22.17 kW• Semi-fast🛒Supermercado Mercadona24/7Active in MITECO registry

Mercadona, Av. Fuente del Rio, Cordoba

Av. Fuente Del Rio, 22, Cabra (14940), Córdoba, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates37.46959, -4.43470
Official ID59YSD3HQFHDYOE8J2LYG
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cabra, belonging to the province of Córdoba (Andalucía, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code59YSD3HQFHDYOE8J2LYG
Post / EVSE Identifier #1WWITGBEWJ2CBLGQGGBE1HKBBTO2
Post / EVSE Identifier #2ES*REP*E14438*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4G6AJAGG7PSXZFUJO9XE5VDZBJ38
Post / EVSE Identifier #5ES*REP*E14438*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7G30WHGYEU1XBU0ZUWVG76L0KJKX
Post / EVSE Identifier #8ES*REP*E14439*1
Post / EVSE Identifier #9OLBCYWSL81VI8PYJXTS9SZSAX8R
Post / EVSE Identifier #10ES*REP*E14439*2

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.469591 | Lon: -4.434696View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
800 m away

22XP22T3KKJAK00961

Urb. El Moredal, 14940 Cabra, Córdoba, Spain
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)🏨Hotel / Alojamiento
2.7 km away

21XP22T3KKJAK00554

Hotel Miltra - A-318, Km 52, 3, 14940 Cabra,
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)
8.1 km away

CO-Lucena-006

Julio Romero De Torres,25
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.