22 kW• Semi-fast24/7Active in MITECO registry

Mercado de Abastos

Avda. De Buenos Aires 2, Pontevedra (36002), Pontevedra, Spain
Network OperatorAPK ELECTRIC, S.L.
Total Capacity4 bays (4 plugs)
GPS Coordinates42.43466, -8.64399
Official IDNV9PSOKBDZ7SW0XBBGLX
Official Registry DateJan 28, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Pontevedra, belonging to the province of Pontevedra (Galicia, Spain). The charging equipment and commercial operation belong to the APK ELECTRIC, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeNV9PSOKBDZ7SW0XBBGLX
Post / EVSE Identifier #10LONJB62IK05BPRSVBWQGVM1MQL
Post / EVSE Identifier #2ES*APK*E682cbedaf12a1bdb980ded9a
Post / EVSE Identifier #31
Post / EVSE Identifier #4MHGC4EYOEEPVITZQOJY04GYJFDK
Post / EVSE Identifier #5ES*APK*E682cbeee7d1c2620130f3c21
Post / EVSE Identifier #64YB80XA91ZT3PPXP0RD2HPULPJ3
Post / EVSE Identifier #7ES*APK*E682cbf08492adbcfb90d424e
Post / EVSE Identifier #8HMQJ1IXHTYLVWOH6JT3BF5UMWQ2
Post / EVSE Identifier #9ES*APK*E682cbf1a1aefa8048f0a142e

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.434661 | Lon: -8.643992View on OpenStreetMap →

Other Nearby Charging Stations

120 kW(Fast)🅿️Parking
340 m away

PARKING SANTA CLARA

Rua Santa Clara, 2
Operator:ENERGEA CONSULTING Y ASESORES SL
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 6 plugs
Details
22 kW(Semi-fast)
4.7 km away

TAELPO

Lugar Ponte Bora, 24
Operator:ENERGEA CONSULTING Y ASESORES SL
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.