22 kW• Semi-fast24/7Active in MITECO registry

Melia Sol Costa Atlantis

Avenida Venezuela, 15, Puerto de la Cruz (38400), Santa Cruz de Tenerife, Spain
Network OperatorWENEA EMOBILITY SERVICES S.L.
Total Capacity2 bays (2 plugs)
GPS Coordinates28.41743, -16.54228
Official ID2024004291
Official Registry DateJun 12, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Puerto de la Cruz, belonging to the province of Santa Cruz de Tenerife (Canarias, Spain). The charging equipment and commercial operation belong to the WENEA EMOBILITY SERVICES S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004291
Post / EVSE Identifier #1COD20240000035080PR00011272
Post / EVSE Identifier #2ES*WEN*EMELIACOSTAATLANTIS021
Post / EVSE Identifier #3093f3c2c-cc28-c9b6-1d4b-ac0e5ffd0f37
Post / EVSE Identifier #4COD20240000035081PR00011273
Post / EVSE Identifier #5ES*WEN*EMELIACOSTAATLANTIS011
Post / EVSE Identifier #602e3b0e2-3fa9-0469-39fb-f54b3b3cc2ae

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Jueves (00:00 - 23:59) Miercoles (00:00 - 23:59) Viernes (00:00 - 23:59) Sabado (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.417432 | Lon: -16.542278View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
2.5 km away

US_296_La_Orotava

C/ Albañilería
Operator:PLENOIL CANARIAS, S.L.U.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
22 kW(Semi-fast)
2.6 km away

61918020810008

Av. Loro Parque, 9, 38400 Puerto De La Cruz,
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
6.99 kW(Standard)
2.6 km away

62007062790005

Avenida Loro Parque, 9
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.