150 kW• Ultra-fast🅿️Parking24/7Active in MITECO registry

Marina de Denia - Parking Exterior

Puerto De Dénia, Edificio Capitanía, Dársena De Babor, S/N, 03700 Dénia, Alicante, Dénia (03700), Alicante/Alacant, Spain
Network OperatorERANOVUM E-MOBILITY, S.L.
Total Capacity3 bays (6 plugs)
GPS Coordinates38.84186, 0.12025
Official ID2024007341
Official Registry DateDec 02, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Dénia, belonging to the province of Alicante/Alacant (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the ERANOVUM E-MOBILITY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
2 connectors available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
3Charging Bay #3
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024007341
Post / EVSE Identifier #1COD20240000047263PR00019056
Post / EVSE Identifier #2ES*ERA*E25121
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #5COD20240000047264PR00019057
Post / EVSE Identifier #6ES*ERA*E25122
Post / EVSE Identifier #7COD20240000047265PR00019058
Post / EVSE Identifier #8ES*ERA*E25123

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

Sabado (00:00 - 23:59) Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Miercoles (00:00 - 23:59) Jueves (00:00 - 23:59) Viernes (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.84186 | Lon: 0.12025View on OpenStreetMap →

Other Nearby Charging Stations

30 kW(Semi-fast)
370 m away

Marina de Denia

Puerto Deportivo
Operator:ERANOVUM E-MOBILITY, S.L.
Tipo 2 (Mennekes)CCS Combo 2
3 points • 5 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.