7.59 kW• Semi-fast24/7Active in MITECO registry

Madrid - Hernani

C/ Hernani, 75, Madrid (28020), Madrid, Spain
Network OperatorP-APP & WEB SERVICIOS DIGITALES S.L.U.
Total Capacity4 bays (4 plugs)
GPS Coordinates40.44799, -3.69555
Official ID6ZULCUFAHNNQR8U5AVIV
Official Registry DateFeb 11, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Madrid, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the P-APP & WEB SERVICIOS DIGITALES S.L.U. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code6ZULCUFAHNNQR8U5AVIV
Post / EVSE Identifier #13D24CXJH5VLUYZZAGGJQWO7MESE
Post / EVSE Identifier #2ES*IPK*E6253222
Post / EVSE Identifier #31
Post / EVSE Identifier #4OVHNGI7JQTNAKUXGZMCIXFAO0MB
Post / EVSE Identifier #5ES*IPK*E6253223
Post / EVSE Identifier #6NIQDWTKGIJMLGEX9NE01ERY5AJR
Post / EVSE Identifier #7ES*IPK*E6253220
Post / EVSE Identifier #8LF2MFBGRCDHAJZ90TDMEGIWGC9Z
Post / EVSE Identifier #9ES*IPK*E6253221

Theoretical Charging Times at Maximum Power (7.59 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 38 min(~2.6 hours)
40 kWh Battery~5 h 16 min(~5.3 hours)
60 kWh Battery~7 h 54 min(~7.9 hours)
80 kWh Battery~10 h 32 min(~10.5 hours)

Opening Hours

Jueves (00:00 - 00:00) Martes (00:00 - 00:00) Miercoles (00:00 - 00:00) Viernes (00:00 - 00:00) Lunes (00:00 - 00:00) Sabado (00:00 - 00:00) Domingo (00:00 - 00:00)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.44799 | Lon: -3.695547View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
8.8 km away

M-ALCOBENDAS-009

Encinar De Los Reyes,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.