50 kW• Fast24/7Active in MITECO registry

Madrid - Ctra Ajalvir-Vicálvaro

Av. De Canillejas A Vicalvaro, 80, Madrid (28037), Madrid, Spain
Network OperatorGalp Energía España, S.A.U.
Total Capacity1 bay (3 plugs)
GPS Coordinates40.42527, -3.61176
Official ID2024004587
Official Registry DateAug 05, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Madrid, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the Galp Energía España, S.A.U. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
3 connectors available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004587
Post / EVSE Identifier #1COD20240000036776PR00011911
Post / EVSE Identifier #2ES*DLP*ECIR62036020005
Post / EVSE Identifier #3101
Post / EVSE Identifier #4102
Post / EVSE Identifier #5103

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Martes (00:00 - 23:59) Miercoles (00:00 - 23:59) Jueves (00:00 - 23:59) Sabado (00:00 - 23:59) Viernes (00:00 - 23:59) Lunes (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.4252744 | Lon: -3.6117582View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
9.2 km away

M-ALCOBENDAS-009

Encinar De Los Reyes,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.