7.59 kW• Semi-fast24/7Active in MITECO registry

Lugo - Plaza del Ferrol

Plaza Ferrol, S/N, Lugo (27001), Lugo, Spain
Network OperatorP-APP & WEB SERVICIOS DIGITALES S.L.U.
Total Capacity6 bays (6 plugs)
GPS Coordinates43.01361, -7.55782
Official IDL8B1YOFFVQSYQYMYJIMY
Official Registry DateFeb 11, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Lugo, belonging to the province of Lugo (Galicia, Spain). The charging equipment and commercial operation belong to the P-APP & WEB SERVICIOS DIGITALES S.L.U. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeL8B1YOFFVQSYQYMYJIMY
Post / EVSE Identifier #1IF15VQ0KRZMQSXSETNECDZC3PDQ
Post / EVSE Identifier #2ES*IPK*E6209220
Post / EVSE Identifier #31
Post / EVSE Identifier #4CFTE4ALPHQMQEWUN5U2FJN9YMHV
Post / EVSE Identifier #5ES*IPK*E6209221
Post / EVSE Identifier #6MJVDCBO48TLQEDMYQ8HKDMJNB1U
Post / EVSE Identifier #7ES*IPK*E6209222
Post / EVSE Identifier #8GFGZKINB795XCGLK53TAQVGYK8R
Post / EVSE Identifier #9ES*IPK*E6209223
Post / EVSE Identifier #10WDMUSGWH6SYB00QPFYCA81NE4Y9
Post / EVSE Identifier #11ES*IPK*E6209224
Post / EVSE Identifier #12SZYHTEYIIOZAL5BSSN6M14VO8P4
Post / EVSE Identifier #13ES*IPK*E6209225

Theoretical Charging Times at Maximum Power (7.59 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 38 min(~2.6 hours)
40 kWh Battery~5 h 16 min(~5.3 hours)
60 kWh Battery~7 h 54 min(~7.9 hours)
80 kWh Battery~10 h 32 min(~10.5 hours)

Opening Hours

Miercoles (00:00 - 00:00) Lunes (00:00 - 00:00) Viernes (00:00 - 00:00) Martes (00:00 - 00:00) Sabado (00:00 - 00:00) Jueves (00:00 - 00:00) Domingo (00:00 - 00:00)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.01361 | Lon: -7.557819View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)🅿️Parking
280 m away

Estacionamientos Lucenses

Rúa Anxel Fole s/n
Operator:ESTACIONAMIENTOS LUCENSES SL
Tipo 2 (Mennekes)
1 point • 9 plugs
Details
22 kW(Semi-fast)
1.4 km away

E-LU-Lugo-005

Sanxillao,N/A
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
2.7 km away

Decathlon Lugo

Parque Empresarial As Gándaras Via A, Parcel
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.