50 kW• Fast24/7Active in MITECO registry

LU-Taboada-001

Carretera 540,45, Taboada (27550), Lugo, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (3 plugs)
GPS Coordinates42.71767, -7.76679
Official ID2024000318
Official Registry DateOct 02, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Taboada, belonging to the province of Lugo (Galicia, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000318
Post / EVSE Identifier #1COD20240000018200PR00000915
Post / EVSE Identifier #2ES*IBD*E220947
Post / EVSE Identifier #3232861
Post / EVSE Identifier #4COD20240000018199PR00000914
Post / EVSE Identifier #5ES*IBD*E220933
Post / EVSE Identifier #6232850
Post / EVSE Identifier #7232849

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
✓PAGO CON TARJETA DE DÉBITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.71767 | Lon: -7.76679View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
760 m away

AIRA OIL TABOADA

Poligono Parque Empresarial de Taboada S/N, 27550, Taboada, Lugo
Operator:ENERGEA CONSULTING Y ASESORES SL
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
1 point • 3 plugs
Details
22 kW(Semi-fast)
9.9 km away

LU-Monterroso-001

De Las Nieves,N/A
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
180 kW(Ultra-fast)
10.2 km away

LU-Monterroso-002

Concepción Arenal,S/N
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.