350 kW• Ultra-fast24/7Active in MITECO registry

La Zenia

Calle Malaquita, Orihuela (03189), Alicante/Alacant, Spain
Network OperatorIONITY GmbH Sucursal en España
Total Capacity6 bays (6 plugs)
GPS Coordinates37.92574, -0.73598
Official ID2024003524
Official Registry DateMay 09, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Orihuela, belonging to the province of Alicante/Alacant (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the IONITY GmbH Sucursal en España network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V350 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:438 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V350 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:438 A
3Charging Bay #3
1 connector available
CCS Combo 2
⚡ 800V350 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:438 A
4Charging Bay #4
1 connector available
CCS Combo 2
⚡ 800V350 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:438 A
5Charging Bay #5
1 connector available
CCS Combo 2
⚡ 800V350 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:438 A
6Charging Bay #6
1 connector available
CCS Combo 2
⚡ 800V350 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:438 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024003524
Post / EVSE Identifier #1COD20240000031470PR00008594
Post / EVSE Identifier #2ES*IOY*E437201
Post / EVSE Identifier #3a1894489-320e-4a4b-ad1e-bb3caa794f82
Post / EVSE Identifier #4COD20240000031471PR00008595
Post / EVSE Identifier #5ES*IOY*E437206
Post / EVSE Identifier #6d0bfad91-fb09-4028-92fb-f57c25b851b5
Post / EVSE Identifier #7COD20240000031472PR00008596
Post / EVSE Identifier #8ES*IOY*E437202
Post / EVSE Identifier #98bb7b13b-d9ba-4eb1-b662-3d0837e68be3
Post / EVSE Identifier #10COD20240000031473PR00008597
Post / EVSE Identifier #11ES*IOY*E437205
Post / EVSE Identifier #12d20f3a67-9ed4-4405-9a77-96f88699a0d9
Post / EVSE Identifier #13COD20240000031474PR00008598
Post / EVSE Identifier #14ES*IOY*E437203
Post / EVSE Identifier #15274a6cc5-7119-4c02-be5c-ceffe47cd91a
Post / EVSE Identifier #16COD20240000031475PR00008599
Post / EVSE Identifier #17ES*IOY*E437204
Post / EVSE Identifier #1898e98ee0-8a3e-4aa7-b628-dec0e3ca894d

Theoretical Charging Times at Maximum Power (350 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~3 min(~0.1 hours)
40 kWh Battery~7 min(~0.1 hours)
60 kWh Battery~10 min(~0.2 hours)
80 kWh Battery~14 min(~0.2 hours)

Opening Hours

Viernes (00:00 - 23:59) Miercoles (00:00 - 23:59) Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Sabado (00:00 - 23:59) Jueves (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.925745 | Lon: -0.735977View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
3.5 km away

E-A-Orihuela-019

Teodoro Llorente Campoamor,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.