60 kW• FastHorario habitualActive in MITECO registry

L-Solsona-004

Tora,34, Olius (25280), Lleida, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (4 plugs)
GPS Coordinates41.99203, 1.51177
Official IDMOMQWV2PHU7PMPT9VYAA
Official Registry DateFeb 09, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Olius, belonging to the province of Lleida (Cataluña, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:150 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:150 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeMOMQWV2PHU7PMPT9VYAA
Post / EVSE Identifier #1GTBWST6SGHZZ8UTEQKQO0IZX8AL
Post / EVSE Identifier #2ES*IBD*E414742
Post / EVSE Identifier #3328632
Post / EVSE Identifier #4O3GW2EVTEVZWDXLRSC1CLKDMUSM
Post / EVSE Identifier #5ES*IBD*E414743
Post / EVSE Identifier #6328633
Post / EVSE Identifier #7HMPSBWEPE6H6RXNH0JYFWK2RGWO
Post / EVSE Identifier #8ES*IBD*E414709
Post / EVSE Identifier #9328614
Post / EVSE Identifier #10BGKFRFEUW0HU92ZOHGYUCKAXDIO
Post / EVSE Identifier #11ES*IBD*E414710
Post / EVSE Identifier #12328615

Theoretical Charging Times at Maximum Power (60 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~20 min(~0.3 hours)
40 kWh Battery~40 min(~0.7 hours)
60 kWh Battery~1 h(~1 hours)
80 kWh Battery~1 h 20 min(~1.3 hours)

Opening Hours

Miercoles (09:00 - 21:30) Lunes (09:00 - 21:30) Martes (09:00 - 21:30) Jueves (09:00 - 21:30) Viernes (09:00 - 21:30)

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)
✓PAGO CON TARJETA DE DÉBITO
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access. Additional amenities: SUPERMERCADO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.9920322 | Lon: 1.5117737View on OpenStreetMap →

Other Nearby Charging Stations

55 kW(Fast)
340 m away

Plaça del camp, 3

Plaça Del Camp, 2, 25280 Solsona, Lleida, Spain
Operator:Etecnic Movilidad Electrica, SRL
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
2 points • 3 plugs
Details
55 kW(Fast)
640 m away

Cr. Vall Fred, 1

Vall Fred, 1, 25280 Solsona, Lleida, Spain
Operator:Etecnic Movilidad Electrica, SRL
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
2 points • 3 plugs
Details
22 kW(Semi-fast)
16.4 km away

Cardona - SELBA EdRSR 1

Plaça Del Portalet
Operator:Etecnic Movilidad Electrica, SRL
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.