300 kW• Ultra-fast24/7Active in MITECO registry

JV_Porsche HPC_AVENIDA CASTELLON 25 - 02

Castellon,25, Geldo (12412), Castellón/Castelló, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity2 bays (2 plugs)
GPS Coordinates39.83436, -0.46780
Official ID2025000488
Official Registry DateMar 12, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Geldo, belonging to the province of Castellón/Castelló (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V300 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:300 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V300 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:300 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000488
Post / EVSE Identifier #1COD20250000050909PR00001887
Post / EVSE Identifier #2ES*FCT*E227714
Post / EVSE Identifier #3239650
Post / EVSE Identifier #4COD20250000050910PR00001888
Post / EVSE Identifier #5ES*FCT*E227715
Post / EVSE Identifier #6239651

Theoretical Charging Times at Maximum Power (300 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~4 min(~0.1 hours)
40 kWh Battery~8 min(~0.1 hours)
60 kWh Battery~12 min(~0.2 hours)
80 kWh Battery~16 min(~0.3 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.83436 | Lon: -0.467797View on OpenStreetMap →

Other Nearby Charging Stations

320 kW(Ultra-fast)
0 m away

CS-Geldo-001

Castellon,25
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
30 kW(Semi-fast)🛒Supermercado Consum
2.5 km away

Supermercado Consum Segorbe

Av. España, 130, 12400 Segorbe, Castellón
Operator:ERANOVUM E-MOBILITY, S.L.
CCS Combo 2Tipo 2 (Mennekes)
2 points • 2 plugs
Details
150 kW(Ultra-fast)🛒Supermercado Aldi
3.4 km away

ALDI ALTURA

C. Geldo, 1
Operator:REMO SUSTAINABLE MOBILITY S.L
CCS Combo 2
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.