22 kW• Semi-fastHorario habitualActive in MITECO registry

J. REDONDO, S.L.

RUA AGRO DAS MOZAS, Nº 32, Outes (15237), Coruña, A, Spain
Network OperatorJ. REDONDO, S.L.
Total Capacity2 bays (4 plugs)
GPS Coordinates42.84467, -8.90417
Official IDMPHUBSQCMSSX5ZZH1O6B
Official Registry DateMay 22, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Outes, belonging to the province of Coruña, A (Galicia, Spain). The charging equipment and commercial operation belong to the J. REDONDO, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeMPHUBSQCMSSX5ZZH1O6B
Post / EVSE Identifier #1GYGUKBIMVOARSUBSQTZHZM8TJAD
Post / EVSE Identifier #2ES*JR1*E00004565
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #5QMJN79EMSSF3YXCVXP4V8WK0XLE
Post / EVSE Identifier #6ES*JR1*E00004566
Post / EVSE Identifier #73
Post / EVSE Identifier #84

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Martes (08:00 - 17:00) Miercoles (08:00 - 17:00) Lunes (08:00 - 17:00) Viernes (08:00 - 17:00) Jueves (08:00 - 17:00)

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
✓PAGO CON TARJETA DE DÉBITO

Accessibility & Amenities

Accessibility: NO.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.8446667 | Lon: -8.9041666View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
19.1 km away

C-Rianxo-001

Ourolo,44
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
3 points • 5 plugs
Details
22 kW(Semi-fast)
21.5 km away

22XP22T3KKJAK00212

Avda. Del Brasil, Rúa Das Cerdeiras, 3, S/N,
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.