7.4 kW• Semi-fast24/7Active in MITECO registry

Indra Bollullos

Carretera Prado De Las Torres, S/N, Bollullos de la Mitación (41110), Sevilla, Spain
Network OperatorWenea Services Spain, S.L.
Total Capacity6 bays (6 plugs)
GPS Coordinates37.34673, -6.13236
Official ID3ECB8UHH07SGXLCELJ09
Official Registry DateNov 17, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Bollullos de la Mitación, belonging to the province of Sevilla (Andalucía, Spain). The charging equipment and commercial operation belong to the Wenea Services Spain, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code3ECB8UHH07SGXLCELJ09
Post / EVSE Identifier #1EVPVXA9E0THEPPDTJTHVIGWAE98
Post / EVSE Identifier #2ES*WEN*EINDRABOLLULLOS011
Post / EVSE Identifier #3f5c88628-6908-0d7d-bd02-75defb47ded5
Post / EVSE Identifier #4IKUZNSLZONKNEDIORVOE5MKINKF
Post / EVSE Identifier #5ES*WEN*EINDRABOLLULLOS021
Post / EVSE Identifier #6848a64ac-37eb-4fb4-6f74-5555e984ba7b
Post / EVSE Identifier #7AGHYLDANENOARFRXWM0GKFINHBY
Post / EVSE Identifier #8ES*WEN*EINDRABOLLULLOS031
Post / EVSE Identifier #95d524086-a606-0414-6d12-70b5b8f00e50
Post / EVSE Identifier #10R9ZOS0MQMSH8406IQI018UONLO9
Post / EVSE Identifier #11ES*WEN*EINDRABOLLULLOS041
Post / EVSE Identifier #12590103fe-b7e3-6b3b-1790-f3119a500ba0
Post / EVSE Identifier #136UYRDFEVXK1BHOY8C6VA94J8OHC
Post / EVSE Identifier #14ES*WEN*EINDRABOLLULLOS051
Post / EVSE Identifier #156605e82e-dcff-12e3-0871-36904e1236df
Post / EVSE Identifier #16LYCCFEWRVOQPVRRJNFJREJAGO2G
Post / EVSE Identifier #17ES*WEN*EINDRABOLLULLOS061
Post / EVSE Identifier #18480ef018-fca3-a7c4-f86e-ec7b8fe6977e

Theoretical Charging Times at Maximum Power (7.4 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 42 min(~2.7 hours)
40 kWh Battery~5 h 24 min(~5.4 hours)
60 kWh Battery~8 h 6 min(~8.1 hours)
80 kWh Battery~10 h 49 min(~10.8 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.346732 | Lon: -6.132361View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
7.1 km away

SE-Bormujos-002

Francisco Tomas Y Valiente,19
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
12 points • 12 plugs
Details
22 kW(Semi-fast)
9.5 km away

E-SE-CoriaDelRio-001

Primero De Mayo,48
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.