22 kW• Semi-fast24/7Active in MITECO registry

Ilunion Alcora

Carretera Tomares Km 1, San Juan de Aznalfarache (41920), Sevilla, Spain
Network OperatorEmovili Fast, S.L.
Total Capacity6 bays (6 plugs)
GPS Coordinates37.37044, -6.03320
Official IDFPFPKNXIA5LPQGDO68IK
Official Registry DateMar 11, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of San Juan de Aznalfarache, belonging to the province of Sevilla (Andalucía, Spain). The charging equipment and commercial operation belong to the Emovili Fast, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeFPFPKNXIA5LPQGDO68IK
Post / EVSE Identifier #1QTKWDVW9LRUOM1UCZMKYZF4CTZP
Post / EVSE Identifier #2ES*EMO*E3406370
Post / EVSE Identifier #31
Post / EVSE Identifier #48QBO41PCAFBMPDS1AQ4XS4ODPDJ
Post / EVSE Identifier #5ES*EMO*E3406371
Post / EVSE Identifier #6NOE1HLP2FWLDIDBDWPDGK7ZHON1
Post / EVSE Identifier #7ES*EMO*E3406372
Post / EVSE Identifier #8FCLQS4BN3DJB8FTFRU3QD905YIE
Post / EVSE Identifier #9ES*EMO*E3406373
Post / EVSE Identifier #10SIELMTYXJ9PGYTAVDQGXAPIMH9U
Post / EVSE Identifier #11ES*EMO*E3406374
Post / EVSE Identifier #12MKMRQENXEFGFIZLKZRBOE97ZEEA
Post / EVSE Identifier #13ES*EMO*E3406375

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
✓PAGO CON TARJETA DE DÉBITO
📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.370435 | Lon: -6.033199View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
3.1 km away

SE-Bormujos-002

Francisco Tomas Y Valiente,19
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
12 points • 12 plugs
Details
7.3 kW(Standard)
3.5 km away

E-41-Sevilla-010

Genil,N/A
Operator:IBERDROLA CLIENTES S.A.U
Schuko (Enchufe doméstico)Tipo 2 (Mennekes)
2 points • 4 plugs
Details
7.4 kW(Semi-fast)
3.5 km away

APK2 Arjona

Arjona S/N
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.