100 kW• Fast24/7Active in MITECO registry

Iberdoex - Los Pantanos

Juan Carlos I,19, Herrera del Duque (06670), Badajoz, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity2 bays (3 plugs)
GPS Coordinates39.17104, -5.04722
Official IDGAYHZGF67PSDXZI6NS56
Official Registry DateJun 30, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Herrera del Duque, belonging to the province of Badajoz (Extremadura, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A
2Charging Bay #2
2 connectors available
CHAdeMO
80 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:200 A
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeGAYHZGF67PSDXZI6NS56
Post / EVSE Identifier #1KMTN6SBAPV1GBUMR3QLGIBHEUDK
Post / EVSE Identifier #2ES*FCT*E230452
Post / EVSE Identifier #3242623
Post / EVSE Identifier #4MW9ULMZR6RWQ7EVOFLMLETH2RGH
Post / EVSE Identifier #5ES*FCT*E230453
Post / EVSE Identifier #6242624
Post / EVSE Identifier #7242625

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE DÉBITO
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.17104 | Lon: -5.047223View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.