150 kW• Ultra-fast🏨Hotel / Alojamiento24/7Active in MITECO registry

Hotel Rural La Lluriga

Calle Ortiz, S/N, Llanes (33596), Asturias, Spain
Network OperatorWENEA EMOBILITY SERVICES S.L.
Total Capacity2 bays (2 plugs)
GPS Coordinates43.40257, -4.74581
Official ID2024004256
Official Registry DateJun 12, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Llanes, belonging to the province of Asturias (Asturias, Principado de, Spain). The charging equipment and commercial operation belong to the WENEA EMOBILITY SERVICES S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:375 A
2Charging Bay #2
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:375 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004256
Post / EVSE Identifier #1COD20240000034930PR00011122
Post / EVSE Identifier #2ES*WEN*ELLURIGA12
Post / EVSE Identifier #348b8b9b6-f26c-ac49-b3e4-adc0eb05e613
Post / EVSE Identifier #4COD20240000034931PR00011123
Post / EVSE Identifier #5ES*WEN*ELLURIGA11
Post / EVSE Identifier #679d62979-ed95-4501-e19b-8ddc95f579d9

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

Sabado (00:00 - 23:59) Martes (00:00 - 23:59) Miercoles (00:00 - 23:59) Lunes (00:00 - 23:59) Viernes (00:00 - 23:59) Jueves (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.402571 | Lon: -4.745808View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)🏨Hotel / Alojamiento
1.2 km away

Hotel la Palma

Avenida Félix, Fernández Vega S/N
Operator:EDP CLIENTES SAU
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
1 point • 3 plugs
Details
7.4 kW(Semi-fast)🏨Hotel / Alojamiento
2.3 km away

Hotel Montemar

José Enrique Rozas Guijarro 8
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
60 kW(Fast)🏨Hotel / Alojamiento
7.3 km away

Hotel Miracielos

Playa De Miracielos - Barro, 33595 Llanes
Operator:ERANOVUM E-MOBILITY, S.L.
CCS Combo 2Tipo 2 (Mennekes)
2 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.