7.4 kW• Semi-fast🏨Hotel / Alojamiento24/7Active in MITECO registry

Hotel NH Collection Palacio de los Castellanos

Calle San Pablo, 58-64, Carbajosa de la Sagrada (37008), Salamanca, Spain
Network OperatorWenea Services Spain, S.L.
Total Capacity2 bays (2 plugs)
GPS Coordinates40.96113, -5.66435
Official ID2024004127
Official Registry DateApr 01, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Carbajosa de la Sagrada, belonging to the province of Salamanca (Castilla y León, Spain). The charging equipment and commercial operation belong to the Wenea Services Spain, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004127
Post / EVSE Identifier #1COD20240000034209PR00010401
Post / EVSE Identifier #2ES*WEN*ENHCASTELLANOS12
Post / EVSE Identifier #365ba2b06-893d-9855-20bf-ca6934154feb
Post / EVSE Identifier #4COD20240000034210PR00010402
Post / EVSE Identifier #5ES*WEN*ENHCASTELLANOS11
Post / EVSE Identifier #6f7c166a4-98e1-235e-ad09-62a6de1146d9

Theoretical Charging Times at Maximum Power (7.4 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 42 min(~2.7 hours)
40 kWh Battery~5 h 24 min(~5.4 hours)
60 kWh Battery~8 h 6 min(~8.1 hours)
80 kWh Battery~10 h 49 min(~10.8 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.961125 | Lon: -5.664349View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
890 m away

SA-Salamanca-015

Carmelitas,94
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)🅿️Parking
910 m away

Parking Campillo - Parkia

Pl. Del Campillo, S/N
Operator:WENEA EMOBILITY SERVICES S.L.
Tipo 2 (Mennekes)
5 points • 5 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.