50 kW• Fast🏨Hotel / Alojamiento24/7Active in MITECO registry

Hotel Ignacio

Autovía A-3, N-Iii, Km 323-326, Chiva (46370), Valencia/València, Spain
Network OperatorWENEA EMOBILITY SERVICES S.L.
Total Capacity6 bays (6 plugs)
GPS Coordinates39.46283, -0.72608
Official ID2024003909
Official Registry DateJun 12, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Chiva, belonging to the province of Valencia/València (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the WENEA EMOBILITY SERVICES S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:62 A
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
3Charging Bay #3
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:62 A
5Charging Bay #5
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
6Charging Bay #6
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024003909
Post / EVSE Identifier #1COD20240000033299PR00009491
Post / EVSE Identifier #2ES*WEN*EIGNACIO23
Post / EVSE Identifier #3eff9abc6-56c2-95b4-0365-b29fe48b2fab
Post / EVSE Identifier #4COD20240000033300PR00009492
Post / EVSE Identifier #5ES*WEN*EIGNACIO22
Post / EVSE Identifier #6c5e1dbb9-c7a3-5845-5964-28c4d3b4d227
Post / EVSE Identifier #7COD20240000033301PR00009493
Post / EVSE Identifier #8ES*WEN*EIGNACIO21
Post / EVSE Identifier #9ad7359ed-b14e-b8c2-759d-b017254f0053
Post / EVSE Identifier #10COD20240000033302PR00009494
Post / EVSE Identifier #11ES*WEN*EIGNACIO13
Post / EVSE Identifier #12a27c5cc5-b4d6-baef-5b69-ce7703002b55
Post / EVSE Identifier #13COD20240000033303PR00009495
Post / EVSE Identifier #14ES*WEN*EIGNACIO12
Post / EVSE Identifier #150ff3d6cf-21b7-c9f6-aae1-a828ca869d82
Post / EVSE Identifier #16COD20240000033304PR00009496
Post / EVSE Identifier #17ES*WEN*EIGNACIO11
Post / EVSE Identifier #1842d66ef4-a7ed-72fc-212a-b57831b6b87e

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Miercoles (00:00 - 23:59) Martes (00:00 - 23:59) Sabado (00:00 - 23:59) Lunes (00:00 - 23:59) Viernes (00:00 - 23:59) Jueves (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.462826 | Lon: -0.726079View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
1.3 km away

V-Chiva-002-2

Incolla (Pg La Pahilla),281
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2CHAdeMO
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.