22 kW• Semi-fast🏨Hotel / Alojamiento24/7Active in MITECO registry

Hotel Eden Roc & Spa by Brava Hoteles

Punta De Port Salvi, S/N, Carrer De Port Salvi, 14, Sant Feliu de Buixalleu (17220), Girona, Spain
Network OperatorWenea Services Spain, S.L.
Total Capacity2 bays (2 plugs)
GPS Coordinates41.77231, 3.03020
Official ID2024006535
Official Registry DateAug 12, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sant Feliu de Buixalleu, belonging to the province of Girona (Cataluña, Spain). The charging equipment and commercial operation belong to the Wenea Services Spain, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024006535
Post / EVSE Identifier #1COD20240000044696PR00016820
Post / EVSE Identifier #2ES*WEN*EHBRAVAEDENROC012
Post / EVSE Identifier #3789b6833-db52-ec54-23b4-39bdfac72e75
Post / EVSE Identifier #4COD20240000044697PR00016821
Post / EVSE Identifier #5ES*WEN*EHBRAVAEDENROC011
Post / EVSE Identifier #6680dcc56-7a77-cd7a-fefa-04ad8807292c

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.772315 | Lon: 3.030196View on OpenStreetMap →

Other Nearby Charging Stations

150 kW(Ultra-fast)
5.3 km away

ES_BP_PLATJA D'ARO

Avenida De Paris,4
Operator:CHARGING TOGETHER SL
CCS Combo 2
2 points • 2 plugs
Details
22 kW(Semi-fast)
5.8 km away

GI-CASTELLDARO-002

Pineda Del Mar,1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.