7 kW• Standard24/7Active in MITECO registry

Hermanos García Noblejas 43 - Oficinas

Calle Hermanos García Noblejas 43, Madrid (28037), Madrid, Spain
Network OperatorERANOVUM E-MOBILITY, S.L.
Total Capacity8 bays (8 plugs)
GPS Coordinates40.43105, -3.63267
Official ID2023002693
Official Registry DateSep 18, 2023

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Madrid, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the ERANOVUM E-MOBILITY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002693
Post / EVSE Identifier #1COD20230000012033PR00001436
Post / EVSE Identifier #2ES*ERA*E25001
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20230000012034PR00001437
Post / EVSE Identifier #5ES*ERA*E25002
Post / EVSE Identifier #6COD20230000012035PR00001438
Post / EVSE Identifier #7ES*ERA*E25003
Post / EVSE Identifier #8COD20230000012036PR00001439
Post / EVSE Identifier #9ES*ERA*E25004
Post / EVSE Identifier #10COD20230000012037PR00001440
Post / EVSE Identifier #11ES*ERA*E25005
Post / EVSE Identifier #12COD20230000012038PR00001441
Post / EVSE Identifier #13ES*ERA*E25006
Post / EVSE Identifier #14COD20230000012039PR00001442
Post / EVSE Identifier #15ES*ERA*E25007
Post / EVSE Identifier #16COD20230000012040PR00001443
Post / EVSE Identifier #17ES*ERA*E25008

Theoretical Charging Times at Maximum Power (7 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 51 min(~2.9 hours)
40 kWh Battery~5 h 43 min(~5.7 hours)
60 kWh Battery~8 h 34 min(~8.6 hours)
80 kWh Battery~11 h 26 min(~11.4 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.4310514 | Lon: -3.6326652View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
8.5 km away

M-ALCOBENDAS-009

Encinar De Los Reyes,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.