50 kW• Fast24/7Active in MITECO registry

H-Huelva-006

Doctor Emilio Haya Prats,14, Ávila (05001), Ávila, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (3 plugs)
GPS Coordinates40.65555, -4.69010
Official ID2024002080
Official Registry DateNov 04, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Ávila, belonging to the province of Ávila (Castilla y León, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024002080
Post / EVSE Identifier #1COD20240000025597PR00005248
Post / EVSE Identifier #2ES*IBD*E228996
Post / EVSE Identifier #3241111
Post / EVSE Identifier #4241110
Post / EVSE Identifier #5COD20240000025596PR00005247
Post / EVSE Identifier #6ES*IBD*E220885
Post / EVSE Identifier #7232796

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
✓PAGO CON TARJETA DE DÉBITO
📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access. Additional amenities: RESTAURANTE

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.655552 | Lon: -4.690103View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
0 m away

AV-AVILA-006

Santa Ana,7
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
2 points • 3 plugs
Details
22 kW(Semi-fast)
550 m away

Telpark - El Grande

Pza. De Santa Teresa, S/N
Operator:MAKSU ESPAÑA SL
Tipo 2 (Mennekes)
7 points • 7 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.