14 kW• Semi-fast24/7Active in MITECO registry

GU-Uceda-002

Zurich,0, Uceda (19188), Guadalajara, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (2 plugs)
GPS Coordinates40.78905, -3.49846
Official ID2024000178
Official Registry DateJan 19, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Uceda, belonging to the province of Guadalajara (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
14 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
14 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000178
Post / EVSE Identifier #1COD20240000017785PR00000500
Post / EVSE Identifier #2ES*IBD*E214589
Post / EVSE Identifier #3226375
Post / EVSE Identifier #4COD20240000017786PR00000501
Post / EVSE Identifier #5ES*IBD*E214590
Post / EVSE Identifier #6226376

Theoretical Charging Times at Maximum Power (14 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~1 h 26 min(~1.4 hours)
40 kWh Battery~2 h 51 min(~2.9 hours)
60 kWh Battery~4 h 17 min(~4.3 hours)
80 kWh Battery~5 h 43 min(~5.7 hours)

Opening Hours

Miercoles (00:00 - 23:59) Jueves (00:00 - 23:59) Lunes (00:00 - 23:59) Martes (00:00 - 23:59) Sabado (00:00 - 23:59) Domingo (00:00 - 23:59) Viernes (00:00 - 23:59)

Supported Payment Methods

📅Advance slot reservation supported
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.789049 | Lon: -3.498464View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
6.8 km away

GU-Uceda-001

Torrelaguna,1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
11.4 km away

E-GU-ElCasar-001

Fuente El Saz,51
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.