180 kW• Ultra-fast24/7Active in MITECO registry

GU-Guadalajara-008

Teresa Claramunt,2, Guadalajara (19005), Guadalajara, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (2 plugs)
GPS Coordinates40.64488, -3.15620
Official ID2024000190
Official Registry DateJan 19, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Guadalajara, belonging to the province of Guadalajara (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CHAdeMO
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000190
Post / EVSE Identifier #1COD20240000017813PR00000528
Post / EVSE Identifier #2ES*IBD*E194208
Post / EVSE Identifier #3205413
Post / EVSE Identifier #4COD20240000017814PR00000529
Post / EVSE Identifier #5ES*IBD*E194209
Post / EVSE Identifier #6205414

Theoretical Charging Times at Maximum Power (180 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~7 min(~0.1 hours)
40 kWh Battery~13 min(~0.2 hours)
60 kWh Battery~20 min(~0.3 hours)
80 kWh Battery~27 min(~0.4 hours)

Opening Hours

Miercoles (00:00 - 23:59) Jueves (00:00 - 23:59) Sabado (00:00 - 23:59) Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Viernes (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.644883 | Lon: -3.156205View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
2.7 km away

AhorraMas Aritio

C. De Francisco Aritio 105
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.