50 kW• Fast24/7Active in MITECO registry

GU-Guadalajara-003

Eduardo Guitian,N/A, Guadalajara (19002), Guadalajara, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (6 plugs)
GPS Coordinates40.62120, -3.16431
Official ID2024000302
Official Registry DateNov 04, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Guadalajara, belonging to the province of Guadalajara (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:63 A
2Charging Bay #2
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:63 A
4Charging Bay #4
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000302
Post / EVSE Identifier #1COD20240000018145PR00000860
Post / EVSE Identifier #2ES*IBD*E157122
Post / EVSE Identifier #3166595
Post / EVSE Identifier #4COD20240000018146PR00000861
Post / EVSE Identifier #5ES*IBD*E157123
Post / EVSE Identifier #6166597
Post / EVSE Identifier #7166596
Post / EVSE Identifier #8COD20240000018147PR00000862
Post / EVSE Identifier #9ES*IBD*E157124
Post / EVSE Identifier #10166598
Post / EVSE Identifier #11COD20240000018148PR00000863
Post / EVSE Identifier #12ES*IBD*E157125
Post / EVSE Identifier #13166600
Post / EVSE Identifier #14166599

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓PAGO CON TARJETA DE DÉBITO
✓PAGO CON TARJETA DE CRÉDITO
📅Advance slot reservation supported
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.621195 | Lon: -3.164314View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
2.7 km away

AhorraMas Aritio

C. De Francisco Aritio 105
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.