250 kW• Ultra-fast24/7Active in MITECO registry

Granada, Spain - Urban

C. Menéndez Pelayo, C. Menéndez Pelayo, Granada (18016), Granada, Spain
Network OperatorTesla Spain SLU
Total Capacity8 bays (8 plugs)
GPS Coordinates37.14381, -3.60551
Official ID2025000296
Official Registry DateFeb 13, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Granada, belonging to the province of Granada (Andalucía, Spain). The charging equipment and commercial operation belong to the Tesla Spain SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
4Charging Bay #4
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
5Charging Bay #5
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
6Charging Bay #6
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
7Charging Bay #7
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
8Charging Bay #8
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000296
Post / EVSE Identifier #1COD20250000049005PR00001311
Post / EVSE Identifier #2ES*TSL*E0TUB9Z
Post / EVSE Identifier #323c9b9eb-8e2f-466b-ae27-dc204f338716
Post / EVSE Identifier #4COD20250000049006PR00001312
Post / EVSE Identifier #5ES*TSL*E0TUB9Y
Post / EVSE Identifier #6b8f50d7b-dfc1-4a67-9c85-e0a44cd2cea6
Post / EVSE Identifier #7COD20250000049007PR00001313
Post / EVSE Identifier #8ES*TSL*E0TUBA9
Post / EVSE Identifier #982d41374-7044-49cd-b3fe-9190e01116b2
Post / EVSE Identifier #10COD20250000049008PR00001314
Post / EVSE Identifier #11ES*TSL*E0TUB9X
Post / EVSE Identifier #12e53197fd-c2b2-41fd-b1cd-3fd5c298054a
Post / EVSE Identifier #13COD20250000049009PR00001315
Post / EVSE Identifier #14ES*TSL*E0TUBA8
Post / EVSE Identifier #152af24ea7-ce99-4083-9d3a-c255bcbe5a58
Post / EVSE Identifier #16COD20250000049010PR00001316
Post / EVSE Identifier #17ES*TSL*E0TUB9W
Post / EVSE Identifier #183be179ae-8b82-41be-adf4-3d31eba1329d
Post / EVSE Identifier #19COD20250000049011PR00001317
Post / EVSE Identifier #20ES*TSL*E0TUBAB
Post / EVSE Identifier #21b9e29bbf-dbf1-48ad-b84c-27fe634e5512
Post / EVSE Identifier #22COD20250000049012PR00001318
Post / EVSE Identifier #23ES*TSL*E0TUBAA
Post / EVSE Identifier #248b381107-5bb7-4727-83d4-07c9a5aba089

Theoretical Charging Times at Maximum Power (250 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~5 min(~0.1 hours)
40 kWh Battery~10 min(~0.2 hours)
60 kWh Battery~14 min(~0.2 hours)
80 kWh Battery~19 min(~0.3 hours)

Opening Hours

Martes (00:00 - 23:59) Miercoles (00:00 - 23:59) Jueves (00:00 - 23:59) Sabado (00:00 - 23:59) Viernes (00:00 - 23:59) Lunes (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
✓COMPATIBLE CON TARJETAS CONTACTLESS

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.143806 | Lon: -3.605513View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
1.8 km away

US_218_Armilla

Avda. Cristóbal Colón
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
22 kW(Semi-fast)
2.5 km away

E-GR-LaZubia-001

Gandhi,6
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
7.4 kW(Semi-fast)
2.6 km away

APK2 Arabial

Calle Arabial S/N
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.