100 kW• FastHorario habitualActive in MITECO registry

Fronda Majadahonda

Carretera De Boadilla, 94, Majadahonda (28222), Madrid, Spain
Network OperatorWenea Services Spain, S.L.
Total Capacity6 bays (6 plugs)
GPS Coordinates40.45665, -3.87806
Official IDE7HNESHRBCHOGOXLNFWM
Official Registry DateAug 12, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Majadahonda, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the Wenea Services Spain, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
2Charging Bay #2
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
3Charging Bay #3
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
4Charging Bay #4
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeE7HNESHRBCHOGOXLNFWM
Post / EVSE Identifier #1SFCIOEZDSRNFUXNIYSCSKIYMEAL
Post / EVSE Identifier #2ES*WEN*EFRONDAMAJ11
Post / EVSE Identifier #36c1bd021-71db-ac19-27f0-0098a1fc090c
Post / EVSE Identifier #4QQM2KICUGC8DUBZGUZOUKTBF8LT
Post / EVSE Identifier #5ES*WEN*EFRONDAMAJ12
Post / EVSE Identifier #65c3e4372-414b-b3c6-508c-eaca863bc3c0
Post / EVSE Identifier #7VDDO6WNKRD3FQWTKAJXRFUCUHWW
Post / EVSE Identifier #8ES*WEN*EFRONDAMAJ21
Post / EVSE Identifier #9c20f2f26-ea5e-6712-90bd-cc4a3fc39d5a
Post / EVSE Identifier #10E9WFOSDTDRT6SYIJBXRBDACCHO2
Post / EVSE Identifier #11ES*WEN*EFRONDAMAJ22
Post / EVSE Identifier #1204f4a8a1-02d7-e992-c6f7-b29dd0784c15
Post / EVSE Identifier #131MUTVTVUFXWD0EEOMXVVYLPAWBR
Post / EVSE Identifier #14ES*WEN*EFRONDAMAJ31
Post / EVSE Identifier #156038d1b8-c591-464d-1790-ed0350eeff33
Post / EVSE Identifier #16RFSNFSV3ICC7EX0F14ZPGCO2KA0
Post / EVSE Identifier #17ES*WEN*EFRONDAMAJ32
Post / EVSE Identifier #18e86bffdf-1abd-cbde-0ae2-83941b448fb2

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Miercoles (09:30 - 21:30) Martes (09:30 - 21:30) Jueves (09:30 - 21:30) Viernes (09:30 - 21:30) Domingo (10:00 - 21:00) Lunes (09:30 - 21:30) Sabado (09:30 - 21:30)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.456651 | Lon: -3.878065View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
12.0 km away

M-VillaviciosadeOdon-001

Quitapesares,71
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.