55 kW• Fast24/7Active in MITECO registry

Font-Rubí - LAFON EdRR 1

Carrer La Carrerada, Font-rubí (08736), Barcelona, Spain
Network OperatorEtecnic Movilidad Electrica, SRL
Total Capacity2 bays (3 plugs)
GPS Coordinates41.41505, 1.65005
Official IDUUPPQO9QZKVQMD5T7LGG
Official Registry DateJul 14, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Font-rubí, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the Etecnic Movilidad Electrica, SRL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CHAdeMO
55 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:80 A
CCS Combo 2
55 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:80 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:80 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeUUPPQO9QZKVQMD5T7LGG
Post / EVSE Identifier #1XPPCKVWYH3GSHG9CUVAH05Z8OJP
Post / EVSE Identifier #2ES*ETE*E2235
Post / EVSE Identifier #3322425
Post / EVSE Identifier #4322426
Post / EVSE Identifier #5FRGAVMKRO9F1KLZCU3XHTDGWDON
Post / EVSE Identifier #6ES*ETE*E2237
Post / EVSE Identifier #7322427

Theoretical Charging Times at Maximum Power (55 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~22 min(~0.4 hours)
40 kWh Battery~44 min(~0.7 hours)
60 kWh Battery~1 h 5 min(~1.1 hours)
80 kWh Battery~1 h 27 min(~1.5 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.415049 | Lon: 1.650047View on OpenStreetMap →

Other Nearby Charging Stations

30 kW(Semi-fast)🛒Supermercado Consum
9.0 km away

Supermercado Consum Vilafranca del Penedes

Avinguda De Tarragona, 97, 101, 08720 Vilafranca Del Penedès, Barcelona
Operator:ERANOVUM E-MOBILITY, S.L.
Tipo 2 (Mennekes)CCS Combo 2
3 points • 3 plugs
Details
120 kW(Fast)
12.1 km away

B-Avinyonetdepenedes-001

Doctor Parellada,N/A
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.