50 kW• Fast24/7Active in MITECO registry

Fluvià 102-118

Fluvià 102-118, Barcelona (08019), Barcelona, Spain
Network OperatorBARCELONA DE SERVEIS MUNICIPALS, SA
Total Capacity4 bays (10 plugs)
GPS Coordinates41.40987, 2.20317
Official ID2024007184
Official Registry DateNov 28, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Barcelona, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the BARCELONA DE SERVEIS MUNICIPALS, SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
3 connectors available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:225 V
Amperage:32 A
2Charging Bay #2
3 connectors available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:225 V
Amperage:32 A
3Charging Bay #3
2 connectors available
Schuko (Enchufe doméstico)
3.6 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:225 V
Amperage:16 A
Schuko (Enchufe doméstico)
3.6 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:225 V
Amperage:16 A
4Charging Bay #4
2 connectors available
Schuko (Enchufe doméstico)
3.6 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:225 V
Amperage:16 A
Schuko (Enchufe doméstico)
3.6 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:225 V
Amperage:16 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024007184
Post / EVSE Identifier #1COD20240000046435PR00018225
Post / EVSE Identifier #2ES*BSM*E11181
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #53
Post / EVSE Identifier #6COD20240000046436PR00018226
Post / EVSE Identifier #7ES*BSM*E11182
Post / EVSE Identifier #8COD20240000046437PR00018227
Post / EVSE Identifier #9ES*BSM*E14567
Post / EVSE Identifier #10COD20240000046438PR00018228
Post / EVSE Identifier #11ES*BSM*E14568

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

📅Advance slot reservation supported
✓PERFIL DE CARGA ADMITIDO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)
🔓Remote plug unlock supported
✓GRUPOS DE TOKENS ADMITIDOS
✓CONECTOR REQUERIDO EN EL INICIO DE SESIÓN

Accessibility & Amenities

Accessibility: SI.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.409874 | Lon: 2.203166View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
4.0 km away

APK2 Centric BCN

Aragó 252
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
7.4 kW(Semi-fast)
4.1 km away

APK2 Plaza del Mar

Passeig De Joan De Borbón 78
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.