22 kW• Semi-fast24/7Active in MITECO registry

FAST Golf Valderrama

Avenida Los Cortijos S/N, San Roque (11310), Cádiz, Spain
Network OperatorEmovili Fast, S.L.
Total Capacity6 bays (6 plugs)
GPS Coordinates36.28252, -5.32692
Official IDDXSHHJAEKCMT6B9XTYL3
Official Registry DateMar 11, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of San Roque, belonging to the province of Cádiz (Andalucía, Spain). The charging equipment and commercial operation belong to the Emovili Fast, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeDXSHHJAEKCMT6B9XTYL3
Post / EVSE Identifier #1WK3GBUSR3RHKVF5SDQJR2PUXCHZ
Post / EVSE Identifier #2ES*EMO*E3686221
Post / EVSE Identifier #31
Post / EVSE Identifier #4E3IZJD3L2ARURV21ZFTVSWBTXOI
Post / EVSE Identifier #5ES*EMO*E3686219
Post / EVSE Identifier #6ZZCFNQXEQTBJRLX0B918FAGIAEO
Post / EVSE Identifier #7ES*EMO*E3686225
Post / EVSE Identifier #8KHWC00E4WYACQWZNVGXFCYNA6VJ
Post / EVSE Identifier #9ES*EMO*E3686223
Post / EVSE Identifier #10WAIRSOU7YUOCXUPP0SXEC0ANQTM
Post / EVSE Identifier #11ES*EMO*E3686229
Post / EVSE Identifier #12DEOEZECAYG8511ZRHBKO22COM0R
Post / EVSE Identifier #13ES*EMO*E3686227

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE DÉBITO
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 36.282524 | Lon: -5.326921View on OpenStreetMap →

Other Nearby Charging Stations

350 kW(Ultra-fast)🏬Centro Comercial
1.4 km away

IONITY Sotogrande

A-7 Km 133, Centro Comercial Mar Y Sol
Operator:IONITY GmbH Sucursal en España
CCS Combo 2
2 points • 2 plugs
Details
22 kW(Semi-fast)
2.6 km away

E-CA-SanRoque-001

N-340 (Cadiz-Malaga),25
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)
12.7 km away

E-MA-Manilva-001

Bolivia,18
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.