120 kW• Fast24/7Active in MITECO registry

Eurostars Madrid Tower

P.º De La Castellana, 259, B, Madrid (28046), Madrid, Spain
Network OperatorGalp Energía España, S.A.U.
Total Capacity3 bays (6 plugs)
GPS Coordinates40.47674, -3.68726
Official ID2024004527
Official Registry DateAug 05, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Madrid, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the Galp Energía España, S.A.U. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
14.8 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Tipo 2 (Mennekes)
14.8 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
2 connectors available
Tipo 2 (Mennekes)
14.8 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Tipo 2 (Mennekes)
14.8 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
2 connectors available
Tipo 2 (Mennekes)
120 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Tipo 2 (Mennekes)
120 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004527
Post / EVSE Identifier #1COD20240000036693PR00011828
Post / EVSE Identifier #2ES*DLP*EH0006P09
Post / EVSE Identifier #3111IZQ
Post / EVSE Identifier #4111DCHA
Post / EVSE Identifier #5COD20240000036694PR00011829
Post / EVSE Identifier #6ES*DLP*EH0006P08
Post / EVSE Identifier #7COD20240000036695PR00011830
Post / EVSE Identifier #8ES*DLP*EH0006P11

Theoretical Charging Times at Maximum Power (120 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~10 min(~0.2 hours)
40 kWh Battery~20 min(~0.3 hours)
60 kWh Battery~30 min(~0.5 hours)
80 kWh Battery~40 min(~0.7 hours)

Opening Hours

Domingo (00:00 - 23:59) Miercoles (00:00 - 23:59) Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Viernes (00:00 - 23:59) Sabado (00:00 - 23:59) Jueves (00:00 - 23:59)

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.4767375 | Lon: -3.6872616View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
6.2 km away

M-ALCOBENDAS-009

Encinar De Los Reyes,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.