22 kW• Semi-fast24/7Active in MITECO registry

Estadio La Cartuja. Sevilla

Zona Isla De La Cartuja, 22, Sevilla (41092), Sevilla, Spain
Network OperatorWenea Services Spain, S.L.
Total Capacity2 bays (2 plugs)
GPS Coordinates37.41834, -6.00191
Official ID1WOZQIIUO4PST5P18290
Official Registry DateAug 12, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sevilla, belonging to the province of Sevilla (Andalucía, Spain). The charging equipment and commercial operation belong to the Wenea Services Spain, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code1WOZQIIUO4PST5P18290
Post / EVSE Identifier #1CT5KZ3WZKD0JJGEUBT9701ZIYOZ
Post / EVSE Identifier #2ES*WEN*ESEVESTADIOCARTUJA11
Post / EVSE Identifier #3bafe6202-c69b-c472-7ba7-bf1cc3e5300f
Post / EVSE Identifier #4IKWI7XHA9E5YNUXKLEFGMGMAUNJ
Post / EVSE Identifier #5ES*WEN*ESEVESTADIOCARTUJA12
Post / EVSE Identifier #6b86a8390-e7d0-a80f-1e73-d92ef05793d2

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.418341 | Lon: -6.001914View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.