480 kW• Ultra-fast24/7Active in MITECO registry

ESTACION SERVICIO MIRALBUENO S.L

CARRETERA LOGROÑO NUMERO 42, Zaragoza (50011), Zaragoza, Spain
Network OperatorESTACION SERVICIO MIRALBUENO S.L
Total Capacity4 bays (4 plugs)
GPS Coordinates41.66342, -0.93042
Official IDC2JBB8PHHIZSBOSJMKGB
Official Registry DateAug 12, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Zaragoza, belonging to the province of Zaragoza (Aragón, Spain). The charging equipment and commercial operation belong to the ESTACION SERVICIO MIRALBUENO S.L network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V480 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:480 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V480 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:480 A
3Charging Bay #3
1 connector available
CCS Combo 2
⚡ 800V480 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:480 A
4Charging Bay #4
1 connector available
CCS Combo 2
⚡ 800V480 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:480 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeC2JBB8PHHIZSBOSJMKGB
Post / EVSE Identifier #18XL9KSRVNHY9NYP9VPGJSZR1V4S
Post / EVSE Identifier #2ES*699*EM
Post / EVSE Identifier #33
Post / EVSE Identifier #4KABXNLSR3YJJQAE79U8MHH3I0CF
Post / EVSE Identifier #5ES*699*ES
Post / EVSE Identifier #64
Post / EVSE Identifier #7X0L4KFKGD6MCH1W8MEVBY1CCTKZ
Post / EVSE Identifier #8ES*699*EP
Post / EVSE Identifier #91
Post / EVSE Identifier #10KZOBWOAOS9GOLYOBGHSKSWCJLFS
Post / EVSE Identifier #11ES*699*EC
Post / EVSE Identifier #122

Theoretical Charging Times at Maximum Power (480 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~3 min(~0 hours)
40 kWh Battery~5 min(~0.1 hours)
60 kWh Battery~8 min(~0.1 hours)
80 kWh Battery~10 min(~0.2 hours)

Opening Hours

24/7

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
✓COMPATIBLE CON TARJETAS CON CHIP
✓PERFIL DE CARGA ADMITIDO
✓PAGO CON TARJETA DE DÉBITO
✓COMPATIBLE CON TARJETAS CONTACTLESS
💳RFID Card / Keyfob reader

Accessibility & Amenities

Accessibility: SI. Additional amenities: ESTACIÓN DE SERVICIO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.663417 | Lon: -0.930423View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
390 m away

E.S. LOS IBONES

Pº LAGOS DEL ALBA Nº2 (N-232 P.K 243 margen dcho)
Operator:ZOILO RIOS, S.A.
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
1 point • 3 plugs
Details
50 kW(Fast)
480 m away

E.S. PORTAZGO

AUTOVÍA DE LOGROÑO KM. 0,3
Operator:ZOILO RIOS, S.A.
CHAdeMOCCS Combo 1Tipo 2 (Mennekes)
1 point • 3 plugs
Details
350 kW(Ultra-fast)
780 m away

IONITY Zaragoza

Camino De Monzalbarba Sn
Operator:IONITY GmbH Sucursal en España
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.