150 kW• Ultra-fast⛽Estación BP24/7Active in MITECO registry

Estación bp Faro de Cullera

Sueca ,34, Cullera (46400), Valencia/València, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity2 bays (3 plugs)
GPS Coordinates39.17270, -0.26120
Official ID9OU5EIJFNFHPNWMXWBE8
Official Registry DateMar 02, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cullera, belonging to the province of Valencia/València (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A
2Charging Bay #2
2 connectors available
CHAdeMO
80 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:200 A
CCS Combo 2
⚡ 800V150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code9OU5EIJFNFHPNWMXWBE8
Post / EVSE Identifier #1BOCFN97BBORULI9LKQTXEKEMGLR
Post / EVSE Identifier #2ES*FCT*E230105
Post / EVSE Identifier #3242252
Post / EVSE Identifier #4PA7NPDM97RFZUHLMZABF3D7S74V
Post / EVSE Identifier #5ES*FCT*E230106
Post / EVSE Identifier #6242253
Post / EVSE Identifier #7242254

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.1727 | Lon: -0.2612View on OpenStreetMap →

Other Nearby Charging Stations

12 kW(Semi-fast)
1.5 km away

Aquopolis Cullera

Antigua Carretera Nazaret-Oliva, km. 33, 4640
Operator:Punto Recargas SL
Tipo 2 (Mennekes)
13 points • 13 plugs
Details
22 kW(Semi-fast)
1.7 km away

Cullera - Max Aub

Max Aub, 1
Operator:PAVAPARK MOVILIDAD SL
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.