100 kW• Fast⛽Estación BP24/7Active in MITECO registry

Estación bp El Veril

De La Unión Europea,S/N, Ingenio (35100), Palmas, Las, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity2 bays (2 plugs)
GPS Coordinates27.76541, -15.55860
Official IDAUI7LKI4WCUPPNTUQA4I
Official Registry DateJul 10, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Ingenio, belonging to the province of Palmas, Las (Canarias, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:500 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:500 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeAUI7LKI4WCUPPNTUQA4I
Post / EVSE Identifier #123TYDB6I33F6DUVEPA4TEZ4ZDTG
Post / EVSE Identifier #2ES*FCT*E232605
Post / EVSE Identifier #3244857
Post / EVSE Identifier #4PCFID6OWO9USGM7MEQH2NNQAVKP
Post / EVSE Identifier #5ES*FCT*E232606
Post / EVSE Identifier #6244858

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE DÉBITO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 27.765405 | Lon: -15.558596View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)⛽Estación Shell
8.6 km away

SHELL JUAN GRANDE

Autopista Gc-, Km 34, 6
Operator:Prio Recharge Sl.
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.