22.17 kW• Semi-fast🛒Eroski24/7Active in MITECO registry

Eroski Tudela

Ctra. Zaragoza, S/N, Tudela (31500), Navarra, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates42.03557, -1.58857
Official IDGU2RCHCAWHH3J0G6H3AK
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Tudela, belonging to the province of Navarra (Navarra, Comunidad Foral de, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeGU2RCHCAWHH3J0G6H3AK
Post / EVSE Identifier #12AOXS5WTYSFQLLP3JYXA2PO3UO2
Post / EVSE Identifier #2ES*REP*E14646*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4IH0YMAVRWPVHKI7WF4LUCY7Z7GM
Post / EVSE Identifier #5ES*REP*E14646*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7SKGRT4FI36YIPWQJA48DTAJT8HU
Post / EVSE Identifier #8ES*REP*E14647*1
Post / EVSE Identifier #9XOXZCLYX9OGSQFNTV4Q617KEJTF
Post / EVSE Identifier #10ES*REP*E14647*2

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.035568 | Lon: -1.58857View on OpenStreetMap →

Other Nearby Charging Stations

150 kW(Ultra-fast)
400 m away

NA-Tudela-008

Canal De Mañeru,2
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
50 kW(Fast)
580 m away

NA-Tudela-003

Canal De Tauste,3
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
4 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.