22.17 kW• Semi-fast🛒Eroski24/7Active in MITECO registry

Eroski, Oñati

C/ Arantzazuko Ama, 25, Parking Ext., Oñati (20560), Gipuzkoa, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates43.02837, -2.40944
Official ID0N0OGTV3XNILGLEFGUKX
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Oñati, belonging to the province of Gipuzkoa (País Vasco, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code0N0OGTV3XNILGLEFGUKX
Post / EVSE Identifier #1FI1H9ZEGPC0PJ9MQTMZ00HVDD20
Post / EVSE Identifier #2ES*REP*E14648*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4J9G7GMEUJ9C82MVD2GJ7S2WP4KM
Post / EVSE Identifier #5ES*REP*E14648*2
Post / EVSE Identifier #62
Post / EVSE Identifier #75OLV4FDLHCJJSBVVSHCUDHMZYVY
Post / EVSE Identifier #8ES*REP*E14649*1
Post / EVSE Identifier #9NOJ6LWDZDSRIX7CU0C9FD4LWKNR
Post / EVSE Identifier #10ES*REP*E14649*2

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.028365 | Lon: -2.409438View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
7.6 km away

APK2 Biteri

Biteri Plaza 3
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
7.4 kW(Semi-fast)
7.7 km away

APK2 Laubide

Maalako Errabala Aldea 33
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)
8.8 km away

Avia - Bergara

Urteaga Kalea
Operator:EDP CLIENTES SAU
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.