90 kW• Fast24/7Active in MITECO registry

EESS EL GALLO

Autovía Ruta De La Plata (A66), Salida 539, Casar de Cáceres (10190), Cáceres, Spain
Network OperatorOESTE SOLUCIONES ENERGETICAS, S.L.
Total Capacity2 bays (5 plugs)
GPS Coordinates39.55689, -6.40203
Official ID2024001974
Official Registry DateMar 08, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Casar de Cáceres, belonging to the province of Cáceres (Extremadura, Spain). The charging equipment and commercial operation belong to the OESTE SOLUCIONES ENERGETICAS, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
3 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
2 connectors available
CCS Combo 2
90 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CCS Combo 2
90 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024001974
Post / EVSE Identifier #1COD20240000024966PR00005008
Post / EVSE Identifier #2ES*OSE*E10804
Post / EVSE Identifier #32
Post / EVSE Identifier #43
Post / EVSE Identifier #51
Post / EVSE Identifier #6COD20240000024967PR00005009
Post / EVSE Identifier #7ES*OSE*E5040

Theoretical Charging Times at Maximum Power (90 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~13 min(~0.2 hours)
40 kWh Battery~27 min(~0.4 hours)
60 kWh Battery~40 min(~0.7 hours)
80 kWh Battery~53 min(~0.9 hours)

Opening Hours

Miercoles (00:00 - 23:59) Viernes (00:00 - 23:59) Sabado (00:00 - 23:59) Lunes (00:00 - 23:59) Martes (00:00 - 23:59) Jueves (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.556886 | Lon: -6.402026View on OpenStreetMap →

Other Nearby Charging Stations

150 kW(Ultra-fast)
1.4 km away

HYC15021BZ1394A

Ctra. De Caceres - Casar De Caceres, Km 8,
Operator:ENDESA X WAY, S.L.
CCS Combo 2
2 points • 2 plugs
Details
150 kW(Ultra-fast)
1.4 km away

HYC15022BZ0465A

Ctra. De Caceres - Casar De Caceres, Km 8,
Operator:ENDESA X WAY, S.L.
CCS Combo 2
2 points • 2 plugs
Details
22 kW(Semi-fast)
3.1 km away

CASAR DE CÁCERES

C. Zona Peri-Industrial, 27A
Operator:OESTE SOLUCIONES ENERGETICAS, S.L.
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.