22 kW• Semi-fastHorario habitualActive in MITECO registry

E-Z-Tarazona-001

Teresa Cajal,S/N, Tarazona (50500), Zaragoza, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity6 bays (6 plugs)
GPS Coordinates41.89447, -1.72308
Official ID2024001922
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Tarazona, belonging to the province of Zaragoza (Aragón, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024001922
Post / EVSE Identifier #1COD20240000024829PR00004873
Post / EVSE Identifier #2ES*IBD*E231895
Post / EVSE Identifier #3244056
Post / EVSE Identifier #4COD20240000024830PR00004874
Post / EVSE Identifier #5ES*IBD*E231916
Post / EVSE Identifier #6244077
Post / EVSE Identifier #7COD20240000024831PR00004875
Post / EVSE Identifier #8ES*IBD*E231917
Post / EVSE Identifier #9244078
Post / EVSE Identifier #10COD20240000024832PR00004876
Post / EVSE Identifier #11ES*IBD*E231918
Post / EVSE Identifier #12244079
Post / EVSE Identifier #13COD20240000024833PR00004877
Post / EVSE Identifier #14ES*IBD*E231919
Post / EVSE Identifier #15244080
Post / EVSE Identifier #16COD20240000024834PR00004878
Post / EVSE Identifier #17ES*IBD*E231920
Post / EVSE Identifier #18244081

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Miercoles (09:00 - 21:30) Lunes (09:00 - 21:30) Martes (09:00 - 21:30) Jueves (09:00 - 21:30) Viernes (09:00 - 21:30)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.894473 | Lon: -1.723078View on OpenStreetMap →

Other Nearby Charging Stations

350 kW(Ultra-fast)
16.6 km away

IONITY Tudela Sur

Ap-68 Km 223, Area De Servicio De Tudela Sentido Zaragoza
Operator:IONITY GmbH Sucursal en España
CCS Combo 2
2 points • 2 plugs
Details
350 kW(Ultra-fast)
16.6 km away

IONITY Tudela Norte

Ap-68, Km 223 Área De Servicio De Tudela Sentido Logrono
Operator:IONITY GmbH Sucursal en España
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.