22 kW• Semi-fast24/7Active in MITECO registry

E-V-Valencia-078

Joaquín Costa,15, València (46005), Valencia/València, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity8 bays (8 plugs)
GPS Coordinates39.46630, -0.36709
Official ID3CJJTSH4QT5SVRJCDKIE
Official Registry DateJul 18, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of València, belonging to the province of Valencia/València (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code3CJJTSH4QT5SVRJCDKIE
Post / EVSE Identifier #1FHCHX9SVLVL3IHNZ3PEBKTEEJRH
Post / EVSE Identifier #2ES*IBD*E397256
Post / EVSE Identifier #3310395
Post / EVSE Identifier #4BRKOFRHBD50VITZUQUA3ND252CY
Post / EVSE Identifier #5ES*IBD*E397257
Post / EVSE Identifier #6310396
Post / EVSE Identifier #7XPMNROZ1E6PQQ5TSHGRL9LW2XZK
Post / EVSE Identifier #8ES*IBD*E397260
Post / EVSE Identifier #9310399
Post / EVSE Identifier #109JBPIYTGIWFUN30Y5KUG79FS7PP
Post / EVSE Identifier #11ES*IBD*E397261
Post / EVSE Identifier #12310400
Post / EVSE Identifier #13UKNAWCIBBAPTR7PLBSP6BNDW3CT
Post / EVSE Identifier #14ES*IBD*E397264
Post / EVSE Identifier #15310403
Post / EVSE Identifier #16NK3S82RZ1ZVLUHJBGDRSCG3TRUW
Post / EVSE Identifier #17ES*IBD*E397265
Post / EVSE Identifier #18310404
Post / EVSE Identifier #19A2EOG4MHADALXFARRPCMVXHQO09
Post / EVSE Identifier #20ES*IBD*E397258
Post / EVSE Identifier #21310397
Post / EVSE Identifier #22XIRAIT432YHKHOUBLPEW83CGCSW
Post / EVSE Identifier #23ES*IBD*E397259
Post / EVSE Identifier #24310398

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.4663 | Lon: -0.36709View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
2.5 km away

V-VALENCIA-021

Ricardo Mico,1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
100 kW(Fast)
3.5 km away

V-Valencia-017-2

Fuente En Corts,354
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CCS Combo 2
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.