22 kW• Semi-fastHorario habitualActive in MITECO registry

E-TF-LaLaguna-002

De Los Majuelos,S/N, San Cristóbal de La Laguna (38108), Santa Cruz de Tenerife, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (4 plugs)
GPS Coordinates28.45294, -16.29759
Official ID2024003465
Official Registry DateApr 18, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of San Cristóbal de La Laguna, belonging to the province of Santa Cruz de Tenerife (Canarias, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024003465
Post / EVSE Identifier #1COD20240000030530PR00008453
Post / EVSE Identifier #2ES*IBD*E215110
Post / EVSE Identifier #3226910
Post / EVSE Identifier #4COD20240000030531PR00008454
Post / EVSE Identifier #5ES*IBD*E215111
Post / EVSE Identifier #6226911
Post / EVSE Identifier #7COD20240000030532PR00008455
Post / EVSE Identifier #8ES*IBD*E215411
Post / EVSE Identifier #9227231
Post / EVSE Identifier #10COD20240000030533PR00008456
Post / EVSE Identifier #11ES*IBD*E215412
Post / EVSE Identifier #12227232

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Miercoles (09:00 - 21:30) Jueves (09:00 - 21:30) Domingo (00:00 - 00:00) Lunes (09:00 - 21:30) Sabado (00:00 - 00:00) Martes (09:00 - 21:30) Viernes (09:00 - 21:30)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.452945 | Lon: -16.297585View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
2.0 km away

DISA EL MAYORAZGO

Cl Jesus Hernandez Guzman, 12
Operator:Prio Recharge Sl.
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
3 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.