22 kW• Semi-fast24/7Active in MITECO registry

E-TF-Alajero-001

Fagundo,N/A, Alajeró (38812), Santa Cruz de Tenerife, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (3 plugs)
GPS Coordinates28.06378, -17.23951
Official ID2024003421
Official Registry DateApr 18, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Alajeró, belonging to the province of Santa Cruz de Tenerife (Canarias, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:63 A
2Charging Bay #2
2 connectors available
CHAdeMO
22 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
22 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024003421
Post / EVSE Identifier #1COD20240000030404PR00008325
Post / EVSE Identifier #2ES*IBD*E163938
Post / EVSE Identifier #3173831
Post / EVSE Identifier #4COD20240000030405PR00008326
Post / EVSE Identifier #5ES*IBD*E163939
Post / EVSE Identifier #6173833
Post / EVSE Identifier #7173832

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Martes (00:00 - 23:59) Sabado (00:00 - 23:59) Lunes (00:00 - 23:59) Miercoles (00:00 - 23:59) Viernes (00:00 - 23:59) Jueves (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.063776 | Lon: -17.239514View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
5.6 km away

E-TF-Alajero-002

La Junta,N/A
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
22 kW(Semi-fast)
6.6 km away

E-TF-Vallehermoso-003

Temocoda,18
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
22 kW(Semi-fast)
7.2 km away

E-TF-Vallehermoso-002

General, Gm-2, Laguna Grande,N/A
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
8 points • 12 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.