22 kW• Semi-fastHorario habitualActive in MITECO registry

E-SE-Sevilla-020

Su Eminencia,S/N, Sevilla (41006), Sevilla, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity6 bays (6 plugs)
GPS Coordinates37.36233, -5.95713
Official ID2024002395
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sevilla, belonging to the province of Sevilla (Andalucía, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024002395
Post / EVSE Identifier #1COD20240000026526PR00006177
Post / EVSE Identifier #2ES*IBD*E220359
Post / EVSE Identifier #3232295
Post / EVSE Identifier #4COD20240000026527PR00006178
Post / EVSE Identifier #5ES*IBD*E220360
Post / EVSE Identifier #6232296
Post / EVSE Identifier #7COD20240000026528PR00006179
Post / EVSE Identifier #8ES*IBD*E220361
Post / EVSE Identifier #9232297
Post / EVSE Identifier #10COD20240000026529PR00006180
Post / EVSE Identifier #11ES*IBD*E220362
Post / EVSE Identifier #12232298
Post / EVSE Identifier #13COD20240000026530PR00006181
Post / EVSE Identifier #14ES*IBD*E220370
Post / EVSE Identifier #15232282
Post / EVSE Identifier #16COD20240000026531PR00006182
Post / EVSE Identifier #17ES*IBD*E220371
Post / EVSE Identifier #18232283

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Lunes (09:00 - 21:30) Martes (09:00 - 21:30) Miercoles (09:00 - 21:30) Viernes (09:00 - 21:30) Jueves (09:00 - 21:30)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.362332 | Lon: -5.957133View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
4.7 km away

APK2 Magdalena

San Pablo 1
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.