22 kW• Semi-fastHorario habitualActive in MITECO registry

E-MU-Cartagena-016

Canton,1, Cartagena (30205), Murcia, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (4 plugs)
GPS Coordinates37.61316, -1.00588
Official ID2025000025
Official Registry DateDec 27, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cartagena, belonging to the province of Murcia (Murcia, Región de, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000025
Post / EVSE Identifier #1COD20250000047787PR00000111
Post / EVSE Identifier #2ES*IBD*E229001
Post / EVSE Identifier #3241116
Post / EVSE Identifier #4COD20250000047788PR00000112
Post / EVSE Identifier #5ES*IBD*E229002
Post / EVSE Identifier #6241117
Post / EVSE Identifier #7COD20250000047789PR00000113
Post / EVSE Identifier #8ES*IBD*E229022
Post / EVSE Identifier #9241136
Post / EVSE Identifier #10COD20250000047790PR00000114
Post / EVSE Identifier #11ES*IBD*E229023
Post / EVSE Identifier #12241137

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Sabado (00:00 - 00:00) Lunes (09:00 - 21:30) Martes (09:00 - 21:30) Miercoles (09:00 - 21:30) Viernes (09:00 - 21:30) Jueves (09:00 - 21:30) Domingo (00:00 - 00:00)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.613163 | Lon: -1.005881View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)🅿️Parking
1.9 km away

Parking del Par

Calle Real 34
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
2.1 km away

MU-Cartagena-033

Ferrol,9
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
3.4 km away

MU-Cartagena-034

Pedro Jorquera,0
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.