22 kW• Semi-fastHorario habitualActive in MITECO registry

E-MU-AguaSalada-001

Murcia (De),121, Cehegín (30430), Murcia, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (4 plugs)
GPS Coordinates38.08725, -1.78964
Official IDYBDL092GQTK9GWZ7N3UW
Official Registry DateOct 02, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cehegín, belonging to the province of Murcia (Murcia, Región de, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeYBDL092GQTK9GWZ7N3UW
Post / EVSE Identifier #1YA8NZNCLCDVMCB1NTBF65BGPEIF
Post / EVSE Identifier #2ES*IBD*E396579
Post / EVSE Identifier #3309789
Post / EVSE Identifier #40HJUIXQ4RZC61URTPITQYFMM7QW
Post / EVSE Identifier #5ES*IBD*E396580
Post / EVSE Identifier #6309790
Post / EVSE Identifier #7IPNEYDZFLW1OOU8SIY9CFDZH2ZL
Post / EVSE Identifier #8ES*IBD*E396562
Post / EVSE Identifier #9309772
Post / EVSE Identifier #10NLEUDXVZHKMUFTOPBLDWQ1HWX6I
Post / EVSE Identifier #11ES*IBD*E396563
Post / EVSE Identifier #12309773

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Miercoles (09:00 - 21:30) Martes (09:00 - 21:30) Lunes (09:00 - 21:30) Jueves (09:00 - 21:30) Viernes (09:00 - 21:30)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.087248 | Lon: -1.789643View on OpenStreetMap →

Other Nearby Charging Stations

120 kW(Fast)
510 m away

Cehegín - Calle Ronda Este

Cam. Puertas Claras, 5, 30430 Cehegín, Murcia
Operator:ERANOVUM E-MOBILITY, S.L.
CCS Combo 2Tipo 2 (Mennekes)
1 point • 3 plugs
Details
50 kW(Fast)
3.3 km away

20XM32T7KK4AR00199

C. Moratalla, 2, 30400 Caravaca De La Cruz,
Operator:ENDESA X WAY, S.L.
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
3 points • 3 plugs
Details
30 kW(Semi-fast)🛒Supermercado Consum
6.6 km away

Supermercado Consum Caravaca de la Cruz

Av. Juan Carlos I, 1, 30400 Caravaca De La Cruz, Murcia
Operator:ERANOVUM E-MOBILITY, S.L.
Tipo 2 (Mennekes)CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.